Fauji Cement Company has standing requirement for under mentioned items:
1. Coal
a. Imported Coal including Afghani Coal
b. Local Coal
2. Gypsum
3. Laterite
4. Limestone Dust
5. Packing Material
a. Polypropylene Bags
i. Domestic use
ii. For Export purpose
b. Paper Sacks
i. 2-ply Paper sacks
ii. 3-ply Paper sacks
Coal:
FCCL purchases coal from different origins e.g South Africa, Indonesia, Afghanistan and Local Coal. Our present consumption is about 15,000 MT to 16000 MT per month but on commissioning of new plant in May/June 2011 it will enhanced to 45,000 MT to 48,000 MT per month. Coal having following specifications is generally acceptable but coal of better specifications is given priority:-
Minimum Acceptable Specifications: a. Indonesian Coal
| GCV |
> 6400 Kcal/Kg |
| Ash |
< 14% |
| Volatile Matter |
35 - 43% |
| Sulphur |
< 1% |
| TM (ARB) |
< 11% |
| Hardgrove Index |
38 – 45 |
| AFT |
1250 - 1350 oC |
b. South African Coal
| GCV |
> 6400 Kcal/Kg |
| Ash |
< 14% |
| Volatile Matter |
25 - 35% |
| Sulphur |
< 1% |
| TM (ARB) |
< 8% |
| Hardgrove Index |
38 – 45 |
| AFT |
1250 - 1350 oC |
Note.
- Rate of Coal for Indonesian or South African will be finalized as per the quality of offered coal.
- Payments will be made as under:-
- On CNF Basis. LC at sight/Ussuance LC.
- On FOR Basis.
- Freight charges will be paid at factory after 48 hours of Receiving Report.
- Ninety Percent (90%) of the total cost of material will be paid by Head Office (Finance Department) on 15th day of Receiving Report.
- Ten percent (10%) of remaining amount will be paid on successful completion of Purchase Order after adjustment of premium/penalties as agreed.
- Quantity. Minimum 40,000 MT - 45,000 MT per month.
c. Afghan Coal
| GCV |
> 6300 Kcal/Kg |
| Ash |
< 12% |
| Volatile Matter |
30 - 40% |
| Sulphur |
< 1% |
| TM (ARB) |
< 12% |
| AFT |
1250 - 1350 oC |
d. Local Coal
| GCV |
> 6200 Kcal/Kg |
| Ash |
< 20% |
| Volatile Matter |
> 8% |
| Sulphur |
< 2.5% |
| TM (ARB) |
< 10% |
Note.
- Rate of Coal for Afghani and local will be finalized on FOR basis only as per the quality of offered coal.
- Payments will be made as under:-
- Freight charges will be paid at factory after 48 hours of Receiving Report.
- Ninety Percent (90%) of the total cost of material will be paid by Head Office (Finance Department) on 15th day of Receiving Report.
- Ten percent (10%) of remaining amount will be paid on successful completion of Purchase Order after adjustment of premium/penalties as agreed.
- Price to be quoted on FOR Site Located: Near Village Jhang, Tehsil Fatehjang and District Attock.
Gypsum:
Present consumption is about 6,000 - 7,000 MT per month but on commissioning of new plant in May/June 2011 it will enhance to about 18,000 MT per month.
Acceptable Specifications of Gypsum:
| Purity |
75-95% |
| Moisture |
< 5% |
| SO3 |
< 34.8% |
| SIO2 |
< 5% |
| Size |
< 200mm |
Note.
- Price to be quoted on FOR Site Located: Near Village Jhang, Tehsil Fatehjang and District Attock.
- Rates will be adjusted if purity is found less than 75% and TM increases above 5%.
- Payments will be made as under:-
- Freight charges will be paid at factory after 24 hours of Receiving Report.
- Cost of material will be paid by Head Office (Finance Department) on 15th day of Receiving Report after adjustment of premium / penalties as agreed..
Laterite:
Present consumption is about 6,000 to 7,000 MT per month but on commissioning of new plant in May/June 2011 it will enhance to about 18,000 MT per month.
Acceptable Specifications of Laterite:
| Fe2O3 |
> 35% |
| Al2O3 |
< 8% |
| Moisture |
< 5% |
| Size |
< 200mm |
Note.
- Price to be quoted on FOR Site Located: Near Village Jhang, Tehsil Fatehjang and District Attock.
- Rates will be adjusted if Fe2O3 is found less than 35% and Al2O3 increases above 8%.
- Payments will be made as under:-
- Freight charges will be paid at factory after 24 hours of Receiving Report.
- Cost of material will be paid by Head Office (Finance Department) on 15th day of Receiving Report after adjustment of premium / penalties as agreed..
Limestone Dust
Present consumption is about 60,000 - 80,000 MT per month but on commissioning of new plant in May/June 2011 it will enhance to about 180,000 MT per month.
Specifications:
| CaO |
> 46% |
| Silica |
< 8% |
| MgO |
< 1.3% |
| Moisture |
< 6% |
Note.
- Price to be quoted on FOR Site Located: Near Village Jhang, Tehsil Fatehjang and District Attock.
- Rates will be adjusted if Fe2O3 is found less than 35% and Al2O3 increases above 8%.
- Payments will be made as under:-
- Freight charges will be paid at factory after 24 hours of Receiving Report.
- Cost of material will be paid by Head Office (Finance Department) on 15th day of Receiving Report after adjustment of premium / penalties as agreed..
Packing Material :
Polypropylene Bags with Domestic and Export Printing
Present consumption is about 1,111,000 - 1,500,000 bags per month but on commissioning of new plant in May/June 2011 it will enhance to about 3,300,000 - 4,500,000 bags per month.
Specifications
| Width |
49cm +/- 1cm to contain 50kgs of Ordinary Portland Cement. |
| Length |
61cm +/- 0.5cm |
| Top/Bottom |
10cm |
| Valve Length |
12-14cm |
| Valve Opening |
95mm |
| Printing |
as per Approved Design of FCCL |
| Burstage |
1% Maximum |
Paper Bags - 2 Ply & 3 Ply :
Present consumption is about 800,000 - 1,000,000 bags per month but on commissioning of new plant in May/June 2011 it will enhance to about 2,400,000 - 3,000,000 bags per month.
Specifications:
| Width |
49cm +/- 1cm to contain 50kgs of Ordinary Portland cement. |
| Length |
61cm +/- 0.5cm |
| Top/Bottom |
10cm |
| Valve Length |
12-14cm |
| Valve Opening |
95mm |
| Material for 2-ply |
2 Plies of 100 +90 or 90+90 or 85+85 Gms high quality, unbleached extensible 100% clupack Sack Kraft paper. |
| Material for 3-ply |
3 Plies of 70 Gms high quality, unbleached extensible 100% Clupack Sack Kraft paper. |
| Printing |
as per Approved Design of FCCL |
| Burstage |
Max 1% |
Note.
- Price to be quoted on FOR Site Located: Near Village Jhang, Tehsil Fatehjang and District Attock.
- Payments for Paper and PP bags. Will be made through crossed cheques after 30 days of acceptance/receiving report (RR).
|